GADS event types, contribution codes, fail modes, root cause, corrective actions and GADS codes can be identified and classified quickly and easily. An economical and practical platform, Rapid Deployment is designed to meet the needs of small to medium sized IPPs, utilities or municipal energy providers who need to quickly and cost-effectively implement.
Contact Us support versify. Generation Outage Management:. See it in Action! Schedule a Demo. Generation Outage Management System.
Workflow Enabled! Advanced configurable workflow engine to improve business processes. Given that discovery work can occur on virtually any piece of equipment being worked on, the most practical way to complete this analysis is to go through each piece of equipment in the outage one by one — this author can reassure readers that for certain equipment classes, this can be done quite quickly.
A cross-functional team of operations, maintenance, technical, equipment specialists e. Depending on the equipment class being reviewed, the team makeup will change. Using prior repair history, condition monitoring reports, reliability or failure records, and other data, the team will determine if additional work can be expected for each piece of equipment or group of similar ones. The team must also assess the likelihood of the additional work high; medium; low , as well as its impact on plant operations none, partial slowdown, significant slowdown, full shutdown; for how long?
Are there any safety or environmental implications? Following the initial or detailed condition inspection, a small repair could potentially become a larger one, or even a full replacement; if both scenarios are possible, they must be listed separately. The next step is to put in place the most effective countermeasures to these duration risks. In general, additional repairs that have a greater impact on the duration of the outage will necessitate a higher level of preparedness.
Typically, there is no need to follow up on identified low-probability additional work that has little to no impact on the schedule. There is no way to perform an accurate in-service inspection. The construction material is an alloy steel that is not kept in stock locally and requires a long delivery time on a regular basis. According to the approved job plan, the remaining section of pipe will be inspected again to see if it needs to be replaced during a future outage.
The outage could be extended by 2 to 3 days due to the lengthy delivery of the additional material. Given this risk, the planning team made the following decisions:. The team avoided the risk of a schedule extension if the discovery work materialized for the small incremental cost of additional engineering and inventory carrying costs.
Finally, the method described above will not look for potential discovery work on equipment excluded from the approved scope of the outage. A separate discovery work risk evaluation may be required if the planning team believes this is possible or has happened in the past.
Search across historical and real time data with advanced filtering, sorting, and querying functionality. Control access to sensitive data with industry standard secure authentication, data encryption, and role-based authorization.
Let us know if you have any questions about our product or services. Challenge Utilities Face We built iTOA to help you not only eliminate these challenges but help make your staff happier.
Multiple Data Sources You have a logging system, an access database, excel sheets, word documents, everything in different places and nowhere to consolidate. Incorrectly Entered or Illegible Data Verifying, retrieving, searching, and emailing back and forth to correct incorrect entries with no single source of reference.
Reinventing the Wheel Many utilities face the same challenges. Manual Entry and Manual Reporting Time wasted updating multiple data sources, searching for the right data to manually put into Compliance and Management reports. Lack of Transparency No system to log into from anywhere, and relying on email and phone to track work to be performed.
Benefits of iTOA iTOA streamlines and simplifies your overall System Control processes, reducing redundancy and duplication, saving your company valuable time and money. Reduce Human Error and Double Entry Automate tasks by having inter-linkage, set submission rules, and have set validations in the system. Flexible and Fast Reporting and Querying Fast reporting, querying capabilities, send out reports directly from the system.
Easy Maintenance and Application Support Web-based and easy maintenance. System of Record iTOA, which is integrated to many other systems, become the System of Record and you have one true centralized data repository and view, enabling transparency across the entire organization. Outage Request Scheduling Optimize processing of submitted requests in control centers using configured task driven workflow. Switching Order Management and Tagging Achieve safety and reliability tailored to your switching and tagging rules and processes.
0コメント